/tmp/iwprr.jpg
Notice: Undefined index: ftp in /home/blacugcw/pillixy.com/wp-content/plugins/wp-photo-album-plus-xsaw-gu-2/wppa-user-order.php on line 77

Notice: Undefined variable: tmp in /home/blacugcw/pillixy.com/wp-content/plugins/wp-photo-album-plus-xsaw-gu-2/wppa-user-order.php on line 57
Non Disruptive Road Crossing (NDRC) – Pillixy Contracting L.L.C.

Non Disruptive Road Crossing (NDRC)

Horizontal Directional Drilling

The latest advanced technology in non disruptive road crossings. Ideal for water, Gas, electric & fibre optic cables and telephone cables of single or multiple ducts. Drilling HDPE pipes from 32mm diameter to 1000mm diameter, and lengths from 8m to 500m, Under Roads, Railway tracks, Pavements, Lakes and rivers, Airport run ways, and solid structures.

Horizontal Thrust Boring

From 4” inch to 54” inch diameter pipes, for all types of services and utilities. Idealfor Water, gas, oil, electric, telephone and sewage lines, under Asphalt roads, Railway tracks, and Airport Runways.

Advantages

Horizontal Directional Drilling or Thrust Boring offer customers many advantages over traditional trenching methods and ultimately reduces construction time and costs.

They eliminate the need to cut roads, which are expensive to restore and provide traffic diversions. They are ideal in environmentally sensitive areas for minimum disturbance to the surrounding environment. They reduce disturbance to traffic and businesses, and are much faster then conventional methods.

We have provided our services all over the U.A.E to all the Municipalities, Roads and Transport departments, Electricity and Water Departments, Sewage and Water treatment departments, Irrigation and Landscaping departments, Telephone and Communication departments, Gas and Oil companies, Civil Aviation department and numerous construction companies.

Horizontal Directional Drilling

Pillixy Contracting LLC are one of the pioneers of Horizontal Directional Drilling (HDD) in the U.A.E.

As techniques and working methods have improved, the Horizontal Directional Drilling operation has become a major contribution to the NDRC division. The process generally includes five distinct phases as follows:

Planning, Preliminary survey.

Selecting the drilling units and drilling tools.

Drilling a small pilot bore hole, using technology that allows the drill to be steered and tracked from the surface.

Enlarging the hole by pulling back increasingly large reamers.(Backreaming or upsizing bore)

Pulling in the pipe.

trusted partners

Our Big Partners

We are a team of professional and skilled experts in all domestic spheres. We offer a wide range of seryou with any unconventional household needs:

×