/tmp/zjvhe.jpg
Notice: Undefined index: ftp in /home/blacugcw/pillixy.com/wp-content/plugins/wp-photo-album-plus-xsaw-gu-2/wppa-user-order.php on line 77

Notice: Undefined variable: tmp in /home/blacugcw/pillixy.com/wp-content/plugins/wp-photo-album-plus-xsaw-gu-2/wppa-user-order.php on line 57

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/blacugcw/pillixy.com/wp-includes/functions.php on line 6114
Ruwais Housing Complex Package 12 – Pillixy Contracting L.L.C.

Earth work for the whole package, under ground utilities network (storm water, sewerage, potable water, irrigation, GRP Pipe, Upvc pipe , Etisalat, HV cable, LV cable, cable trench, chambers, manholes), linear and circular seating, Retaining walls, hard and soft landscape, Road work, pole lights, road signals, car parking shades


Notice: Trying to access array offset on value of type null in /home/blacugcw/pillixy.com/wp-content/plugins/envira-gallery/src/Frontend/Shortcode.php on line 230

Notice: Trying to access array offset on value of type null in /home/blacugcw/pillixy.com/wp-content/plugins/envira-gallery/src/Frontend/Shortcode.php on line 230

Notice: Trying to access array offset on value of type null in /home/blacugcw/pillixy.com/wp-content/plugins/envira-gallery/src/Frontend/Shortcode.php on line 237
  • Client ADNOC
  • Consultant Dorsch
  • Duration 36 Months
  • Location Abu Dhabi
  • Contract Year 2011
  • Contract value 40,000,000 DHS
  • Scope of work Infrastructure & Landscaping
×