Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/blacugcw/pillixy.com/wp-includes/functions.php on line 6114
Mirfa 2 – 120 MIGD RO IWP – Pillixy Contracting L.L.C.

Construction of intake structure shoring system including Excavation, dewatering, silt curtains, diving work, dredging work, sheet piles, onshore work

  • Client EWEC - Al Nasr Contracting LLC
  • Consultant AMGD
  • Duration 6 Months
  • Location Al Mirfaq-Abu Dhabi
  • Contract Year 2023
  • Contract value 6,000,000 DHS
  • Scope of work Infrastructure
×